New projects

Construction and certification of a positive pressure room in the Hematology Unit of the P.G.N. Larissa.
Construction of a new controlled environment laboratory space at Intracom Defence.
Implementation of UVC lamp and absolute filter systems in the Operating Rooms and ICUs of the new Onassis National Transplant Centre (O.E.ME.K.). As part of the project, the commissioning of the air conditioning installations and the certification of the Operating Rooms was carried out.
Installation of a new air conditioning system and continuous control systems for microparticles, temperature, humidity and positive pressure, for the upgrade of the operating rooms of the ONASEIOS K.K.